Overview of Proposal:
(FERC Docket No. CP17-101)
Goal of Williams/Transco for the Northeast Supply Enhancement Project (NESE)
-
Deliver 400,000 dekatherms/day of natural gas to NYC
-
Williams/Transco already has a commitment from National Gas to buy this gas
In Pennsylvania, they plan to add:
-
a 10.2-mile, 42-inch pipeline loop of Mainline D in Lancaster County, PA; and
-
a 21,902 horsepower electric-powered compressor unit at STA200, Chester County, PA (where there’s already 13 compressor units)
In New Jersey & New York, they plan to add:
Raritan Bay Loop PipelineSayreville, NJ into & under Raritan Bay |
Madison Loop Pipeline
Old Bridge & Sayreville, NJ
|
23.5-mile, 26-inch loop (0.16 mile onshore and 23.33 miles offshore) of Transco’s Lower New York Bay Lateral from Mile Post 12.00, southwest of the Morgan Meter & Regulator (M&R) Station in Sayreville, NJ to the Rockaway Transfer Point in New York State waters +a 2,375’ CP Power Cable |
3.4-mile, 26-inch loop of Transco’s Lower New York Bay Lateral from Compressor Station 207 at Mile Post 8.57 in Old Bridge to Mile Post 12.00, southwest of the Morgan M&R Station in Sayreville |
Compressor Station 206 Franklin Township (Somerset County) |
|
New compressor station consisting of two natural gas-powered turbine-driven compressor units planned to be built on a 52-acre lot -total horsepower: 32,000Two 50-foot smokestacks where:
Emissions include:
|
Acres Affected by the Northeast Supply Enhancement Project
Onshore |
During Construction (includes workspace, access roads & contractor yards) |
During Operation |
NJ |
95.3 |
29.9 |
PA |
236.8 |
29.8 |
Total |
332.0 |
59.7 |
Offshore |
During Construction (includes excavation – pipe installing & dredging for backfill, vessel mooring & temporary piles) |
During Operation (includes easements) |
NJ water |
4,427.8 |
22.4 |
NY waters |
10,922.2 |
422.6 |
Fed waters |
235.7 |
- |
Total |
15,585.7 |
445.0 |
Williams/Transco claims that 117.2 acres of seafloor will be directly impacted by construction activities:
82.6 acres for the pipeline installation & vessel anchoring/mooring + 36.6 acres to dredge for backfill
Pipeline Construction in Raritan Bay – Navigation Channels
Horizontal directional drilling(HDD) |
Open Cut(Clamshell Dredge, Jet Trencher& Hand Jet |
||
Ambrose Channel(Reach B) |
NJ
|
Raritan Bay
|
NY
|
Madison Shore Approach |
NJ
|
Chapel Hill (North Channel) |
NY
|
Construction of offshore pipeline
-
9 months (quarter 2 of 2019 to end of 2019) is the current proposal
-
7 days per week, 24 hours per day (weather permitting)
*Short portions will be completed separately; need to follow restricted times for to fish or shellfish harvest areas and/or spawning & larval periods.
Note: This is the adjusted (current) proposed route due to anchorage issues. Now = 17.38 miles in NY waters.
Timeline of the NESE Proposal