Township of Franklin, NJ
Home MenuGeneral Permit Instructions
All forms are downloadable for your convenience at Construction Permit Application Packet & Related Forms
If you are not able to download and print forms then visit the Construction office:
475 DeMott Lane | Somerset
Pre-made application packets are also available (for certain projects).
Please contact the Construction Department to request a packet or for information.
Recent changes to what are considered normal maintenance:
The Uniform Construction Code no longer mandates construction permits for the installation of:
-
Siding for one and two family detached dwellings (except for polypropylene)
-
Replacement roofs for one and two family detached dwellings
It is very important to note that all siding and roof replacements for all structures located in a Historic District still require Historic Commission review and approval before the work can commence.
To determine if your property is within an Historic District or for further information, please contact via email Vincent Dominach at or 732-873-2500 (ext. 6274)
Note: Construction permit application review generally takes up to twenty (20) business days from the date the application is received in our department. However, your project may require prior approvals from Zoning, Health, Engineering, Fire Prevention, Water Dept., Sewerage Authority, Historic Committee, Soil Conservation and/or other outside agencies. It is the applicant’s responsibility to contact those agencies to determine requirements. If such prior approval is required, your application review may take longer. The twenty (20) business day period begins on the date the completed construction permit application arrives at the Construction office. During the application review process if it is determined that additional information is required, this may result in a longer review time.
SURVEY MAP - Contact the Zoning Officer for information regarding survey requirements.
TWO COMPLETE SETS of construction plans/drawings. How detailed your plans/drawings are is determined by the extent of your project. Basically, plans/drawings must show where, how and with what material you will be constructing the "project". You must include information AS NECESSARY such as footings, foundation, structural sections, exterior elevations, floor plan, typical wall section, and framing details. Include size and spacing of ceiling or floor joists, wall studs, roof rafters, primary beams, doors & windows; size of framing members (rafters, studs joists, etc.), floor to ceiling height, electrical wiring details & diagrams, plumbing schematics and diagrams, location of smoke detectors, alarms, etc. All dimensions need to be exact. Label everything on your drawings.
If you have questions regarding what needs to be included on your plans, you may call the appropriate Sub Code Official (Building, Electrical, Fire and/or Plumbing). Please see New Jersey Model Code Adoptions page for applicable construction codes.
Plans/drawings may be submitted by the owner of a single family home who has prepared his own plans and will be doing his own construction, alteration or repair of a structure which is used or intended to be used exclusively as his personal residence. The homeowner must print name, street address, block and lot on each page of the plans.
PERMIT APPLICATION FORMS: Forms are Uniform Construction Code required forms and are available in the Construction Code Department Office individually or as part of a "package" i.e., "DECK".
ALL PROJECTS NEED:
- CONSTRUCTION PERMIT APPLICATION (Manila folder)
- CONSTRUCTION PERMIT (5 ½" X 8", 4 part form)
WORK TO BE DONE WILL DETERMINE WHICH OF THE FOLLOWING ARE ALSO NEEDED:
- BUILDING, ELECTRICAL, FIRE AND/OR PLUMBING SUB-CODE
- TECHNICAL CARD (8 ½" X11", 4 part form)
When using a licensed electrician or plumber be sure to provide the following of the professional before submitting:
- Name
- Address
- Telephone
- License #
- Raised seal on the corresponding sub-code permit application
The Construction Code Department has prepared 'packages' for some of the more common projects. They contain forms and/or information exclusive to Franklin Township.
A zoning application will be provided with the necessary forms when requested through the Construction Code Enforcement Office.
All commercial/business projects require submission to the Zoning Office.
Retail food establishments must also apply to the the Health Department